Projects

Green Hippo Innovations have provided specialist input for numerous local and international Consulting engineering firms, Government Departments and Water Boards. Some of these projects are listed below:

Orgainsation

Projects

Africon
Jumeira water supply system in Dubai. Assisting in assessment of pipe failures
BKS
Assisting in various pipeline system analyses
BloemWater
Hydraulic Assessment of the Caledon-Bloemfontein Gravity Pipeline
EVN
Assessment of dynamic pressures of the Majosi bulk water supply pipeline
Golder Associates Africa
Phalaborwa De-watering system dynamic pressure evaluation
Jaco Swart Consulting Engineers
Hydraulic assessment and surge analysis of the Blyde River Irrigation Scheme. Contract value of construction isR120 Million
Kwezi V3 Engineers
Roodeplaat Dam to Wallmansthal raw water pipeline dynamic pressure analyses
LawGibb
Hoxane bulk water transport pipeline. Surge and pipe optimization of booster pumping system
MVD Consulting Engineers (South Cape)
Surge analyses, air valve and pipeline analyses (George Le Grande pipeline, Groot Brak Water supply scheme, Murraysburg pipeline, Pacaltsdorp Irrigation Scheme).
Ndodana Consulting Engineers
Review of various hydraulic designs and storm water systems analyses. These include Kimberley Airport, Storm Water Drainage System crossing the Katlehong – Kwesini railway section, T15 provincial road in Eastern Cape.
Ninham Shand Consulting Engineers
Air valve sizing and positioning analysis (3 m diameter Gurara Transfer Scheme).
Maguga weir model study.
Nyeleti Consulting Engineers
Pipeline analyses and design reviews (Malematja Water Supply scheme).
Petronet
Surge analysis of the Petronet refined products pipeline from Durban to Sasolburg. Total distance of 780 km and 14 pump stations. In collaboration with Africon Pty Ltd.
Stewart Scott International
Dubaydib well field design of valve control system
Rand Water
Surge analyses of the B4, B6 & B10 pipeline systems
Preliminary review of the Lesotho transfer pipeline (Surge analyses, Clarens pipeline 3,5 m diameter)
South African National
Road Agency Limited (SANRAL)
Updating of the old Road Drainage Manual
Review of the N8 Kaalspruit River Bridge (Hydraulic and hydrological aspects)
Hydrological and hydraulic analyses of the Tsitsa Low Level River Bridge
Vektor Ingenieurs
Far East Hospital and Tambo Memorial Hospital site water reticulation design
WRP Consulting Engineers
Conceptual design and sizing of the Khayelitsha pressure control system
WSP International Sweden
Hydraulic Analysis of the Zambezi River for the construction of the 2.5 km long Caia River Bridge. This included the review of previous studies, setting-up of hydraulic model, assessing various bridge options and scour analyses for the preliminary design report.
Department of Agriculture: Western Cape
Hydrological and Hydraulic Study of the Meul River in the Western Cape
Bloemwater
Conduit hydropower – Bloemwater
ESKOM
 Teebus hydro power station phase 1 & 2 – Prefeasibility studies